Presented below is a sample case study that we have done for one of our prominent client in the pharma industry which generates a significant amount of hazardous waste from their API Manufacturing Unit located in Vapi, Gujarat. The client was using both a Boiler and an Incinerator to fulfil its respective purpose. The below case study was presented to replace its Boiler and Incinerator setup with our Patented Technology System of Bin-Cinerator to serve the dual purpose of waste destruction and steam utilization at the same time.
Capital Cost (CAPEX) Calculations
The Bin-Cinerator system for steam / hot water generation by utilizing thermal energy from flue gases generated by waste incineration of the present invention provides a capital cost saving up to 51% compared to a traditional boiler + incinerator setup.
Some elements of a traditional boiler setup and a traditional incinerator setup are same, these are clubbed together in the Bin-Cinerator system. These elements include absorber, wet scrubber and chimney; hence providing direct cost saving to the end user.
Cost of New Boiler and Incinerator = Rs. 2,22,00,000/-
Cost of Bin-cinerator = Rs. 1,08,00,000/-
Capital Cost Savings = Rs. 1,14,00,000/-
Capital Cost Saving in % = 51 %
Carbon Footprint Reduction
The traditional incinerator setup uses Diesel / PNG fired burner to directly incinerate the pharmaceutical waste. On the contrary, the Bin-Cinerator system of the present invention uses biomass briquette as fuel to heat the furnace evenly up to 1000°C and hence achieve uniform combustion of waste via vaporization. The carbon saving by not burning PNG is provided in table 2:
Table 2: Carbon saving yearly if PNG is not utilized for incinerator
Fuel Saving Calculations
The Bin-Cinerator system reduces the fuel consumption up to 40% based on the calorific value of waste generated in the manufacturing process. In the Bin-Cinerator system, pharmaceutical waste having good calorific value is combusted to generate exhaust flue gases, that replaces the fuel required to achieve the desired quantity of steam / hot water.
Table 3: Fuel savings
Calorific Value of Briquette = 3800 kcal/kg
Calorific Value of Gelatine Waste = 4500 kcal/kg
Daily Generation of Gelatine Waste = 800 kgs
Present fuel expense in Rupees/day (as per table 3) = Rs. 35000/day
Daily Fuel Requirement = (3 x 3800) – (0.8 x 4500)
= 11400 – 3600
= 7800/3800
= 2.05 Tonnes/day
Proposed expense on Briquettes = 2.05 x Rs.7200
= Rs. 14750/day
Fuel Savings = Rs. 35000/day - Rs. 14750/day
= Rs. 20250/ day
Fuel Saving in % = 57 %
Operational Cost Saving (OPEX):
As compared to the operations of traditional Boiler + traditional Incinerator setup, the Bin-Cinerator system requires 30% less manpower to run the same setup as compared to running 2 setups separately.
CTC of Boiler Operator = Rs.22,000/month
CTC of Fireman = Rs.18,000/month
Manpower Requirement to run standalone Boiler = 4 Boiler Operator + 4 Fireman
= Rs. (22,000 x 4) + Rs (18,000 x 4)
= Rs. 88,000 + Rs. 72,000
= Rs. 1,60,000/month
Manpower Requirement to run standalone Incinerator = 4 Fireman
= Rs. (18,000 x 4)
= Rs. 72,000/month
Total Manpower required to run standalone Boiler + incinerator
= Rs. 1,60,000 + Rs. 72,000
= Rs. 2,32,000/month
Manpower required to run system 100 = 4 Boiler Operator + 4 Fireman
= Rs. (22,000 x 4) + Rs. (18,000 x 4)
= Rs. 88,000 + Rs. 72,000
= Rs. 1,60,000/month
Manpower Saving = Rs. 2,32,000 – Rs. 1,60,000
= Rs. 72,000/month
Manpower Saving in % = 31 %
Conclusion
The sample case study presented above is based on factual data provided by our client. The data may vary based on the type of waste generated by your plant. Kindly provide us with your waste analysis data to derive a similar report for your unit.
Also get an opportunity for an early-access to our Demo Unit Setup in Nagpur, Maharashtra